HAOR – Comprehensive Refurbishment of the Alkali Pipeline Project (2023)

 

In 2023, a successful refurbishment project was completed on a 3-inch alkali pipeline at the Heydar Aliyev Oil Refinery. Within the scope of the project, a 400-meter section of the pipeline was fully replaced in accordance with modern technical requirements.

The aging and outdated segments of the pipeline were carefully dismantled and replaced with high-quality, durable new piping. During installation, strong and reliable weld joints were ensured, and the entire system underwent comprehensive leak testing to verify its integrity. All stages of the work were carried out under the supervision of experienced professionals, with full compliance to safety protocols and technical standards.

The project was completed within 15 calendar days, during which a high level of efficiency and quality was maintained. At Caspian Engineering Solutions, we once again demonstrated our technical expertise and ability to deliver timely, precise, and high-standard refurbishment works in industrial settings. This renewal plays a key role in supporting the refinery’s uninterrupted and safe operations.